KIMIKO
05-16-2007, 08:43 PM
We are a team that is going to participate in formula student 2007 in class 2, and we have one doubt about the total content of cost report that we must send prior to the event.
The cost report must only reflect the costs for production of the chassis (frame and body)?
We have the BOM and some process description already done for the other groups (systems) that are in the appendix of the A-3 FSAE rules. Such as Brakes System, Suspension and Shocks, Engine and Drivetrain, Wheels, Steering System.
.
If we send the cost with more groups than a Chassis (frame and body) will we be penalized or its adding is unnecessary?
Thanks
The cost report must only reflect the costs for production of the chassis (frame and body)?
We have the BOM and some process description already done for the other groups (systems) that are in the appendix of the A-3 FSAE rules. Such as Brakes System, Suspension and Shocks, Engine and Drivetrain, Wheels, Steering System.
.
If we send the cost with more groups than a Chassis (frame and body) will we be penalized or its adding is unnecessary?
Thanks