Ax
01-02-2010, 11:53 PM
For finding ARB rates, how do i determine the Ib term(installation ratio of ARB) in pg601 of RCVD considering im designing a u-bar with blades and connected to the bell cranks of a push rod system.
also in his Engineer to Win book, Carroll Smith prefers the use of a linked-blade adjustable ARB with blades ending in guided rollers over a simple blade ARB.. can anyone elaborate this design and its working to me?
also in his Engineer to Win book, Carroll Smith prefers the use of a linked-blade adjustable ARB with blades ending in guided rollers over a simple blade ARB.. can anyone elaborate this design and its working to me?