News
-
Results
-
Links
-
Photos
-
Forums
-
Contact Us

    FSAE.com Forums    FSAE.com Forums  Hop To Forum Categories  Static Events    Cost Report - assembly time
Go
New
Find
Notify
Tools
Reply
  
-star Rating Rate It!  Login/Join 
Member
Picture of Ben Beacock
Posted
Do the specified costs (tube bends, cuts, end preps) also require assembly time or is that incorporated into their costs?

ie i have frame tubes that are bent, but does it also require an assembly entry for the time it took to make that bend?

Ben Beacock
Chassis Design and Technical Coordinator
Gryphon Racing - University of Guelph
 
Posts: 350 | Location: Guelph, Ontario, Canada | Registered: November 15, 2002Reply With QuoteEdit or Delete MessageReport This Post
Member
Posted Hide Post
quote:
Do the specified costs (tube bends, cuts, end preps) also require assembly time or is that incorporated into their costs?

ie i have frame tubes that are bent, but does it also require an assembly entry for the time it took to make that bend?


I understood the assembly costs as what it takes to put two parts together. In your case, I would say that the bent tube is a component. If you welded something to that tube, the weld would be part of the assembly cost.

The tube segment itself has no assembly time.
 
Posts: 51 | Location: Irvine, CA | Registered: November 14, 2002Reply With QuoteEdit or Delete MessageReport This Post
 Previous Topic | Next Topic powered by eve community  
 

    FSAE.com Forums    FSAE.com Forums  Hop To Forum Categories  Static Events    Cost Report - assembly time

© FSAE.com 2001-2008